Made in Taiwan since 1978+886-6-2323126Request a Quote
Home / Products / Brake Manufacturing Equipment / Brake Shoe & Lining Production Line
PRODUCT / OEM ODM

Brake Shoe & Lining Production Line

Production equipment and project coordination for drum brake shoe and lining applications, with process stages selected according to the customer's manufacturing method.

Brake Shoe & Lining Production Line

Specifications & Options

Line scopeMaterial preparation, forming / bonding, curing and finishing
ApplicationDrum brake shoe and lining production
Process selectionBonding or molding equipment is selected according to the customer's manufacturing method
EngineeringEquipment sequence, tooling, utilities and factory layout are reviewed by project

Final process sequence and machine specifications depend on the customer's friction material, brake design and production method.

Applications

Drum brake shoe productionBrake lining manufacturingFactory line planningProcess modernization

Selection Guide

  • Identify the shoe and lining design and distinguish forming requirements from bonding requirements.
  • Document existing tooling and factory utilities when reviewing a new line or process upgrade.

Product & Manufacturing Highlights

  • Material preparation and forming stages
  • Bonding or molding equipment reviewed by application
  • Curing and finishing process integration
  • Factory layout and tooling requirements reviewed by project

OEM / ODM Projects

Materials, dimensions, tolerances, testing and packaging can be defined according to drawings, samples and customer requirements.

Frequently Asked Questions

How is a brake shoe or lining line configured?

Material preparation, forming or bonding, curing and finishing are selected for the brake design and manufacturing method. Provide the shoe and lining drawings and process requirements to define the equipment sequence.

Are bonding and molding requirements the same?

The suitable equipment depends on the customer manufacturing method. State whether the project forms friction material, bonds lining to a shoe, or combines stages; the final process scope is reviewed before quotation.

What should be supplied for a factory modernization review?

Include the existing process, equipment list, tooling, utilities, layout and the required output or quality improvement. Machine specifications and acceptance requirements are then confirmed for that project.

PROJECT / RFQ

Have a drawing, sample or sourcing requirement?

Share the product, quantity, material/specification and target market so we can prepare the appropriate product and quotation details.